cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Do i need to wait for an engineer

Cayleigh85
Visitor

Hi, I have just received my three boxes for broadband, the engineer isn’t due to come for another 10 days, do i need to wait to connect everything? 

1 REPLY 1
XRaySpeX
EE Community Star
EE Community Star

You could possibly set up the router free-standing to accept your devices but w/out plugging it to your BB but probably best to wait for the install.

Is this an upgrade of BB within EE or are you migrating BB from another ISP?

If you think I helped please feel free to hit the "Thumbs Up" button below.

To phone EE CS: Dial Freephone +44 800 079 8586 - Option 1 for Home Broadband & Home Phone or Option 2 for Mobile Phone & Mobile Broadband

ISPs: 1999: Freeserve 48K Dial-Up > 2005: Wanadoo 1 Meg BB > 2007: Orange 2 Meg BB > 2008: Orange 8 Meg LLU > 2010: Orange 16 Meg LLU > 2011: Orange 20 Meg WBC > 2014: EE 20 Meg WBC > 2020: EE 40 Meg FTTC > 2022:EE 80 Meg FTTC SoGEA > 2025 EE 150 Meg FTTP