15-05-2026 04:48 PM
Hi all.
I'm just migrating from plusnet to EE with an engineers appointment for fibre install for May 19th. I'm getting opposite text messages on alternate days. First day suggesting everythings on track, then next day saying sorry slight delay and repeat. I just wondered if this is usual ? The router and ATA came today, so at least thats here.
Fibre has only just become available here. (rural low population area)
15-05-2026 08:06 PM
I confused how/why you got 2 contradictory results from the BTw Checker:
15-05-2026 08:58 PM - edited 15-05-2026 09:03 PM
@Spik3y You may find the link below helpful but if you do not have a CBT up your pole, or any sign of a new Fibre cable on the pole there may be a mix up with all the information. As you say the Engineer did prompt that it was done and can see why the wind farm would be looking to get Fibre for the remote control of the turbines... OR may have planned and pulled in a Fibre cable to cover the two cottages you just never know, they sometimes just leave a cable coiled up ready to do a quick connection.
How is Full Fibre Installed? Openreach
From the link above in case you miss it, Fibre availability | Openreach
16-05-2026 01:00 AM
I went out with the binoculars earlier and the pole in the farm road definitely looks to have newer cables/boxes, than the pole on our boundary.